POST Phase
To configure
your HP LCD:
Following these checks, the POST (Power-On Self Test) sequence is
initiated. One of the following screens will appear in this phase:
HP Kayak XM600
INFO
SERVICES
No errors occurred.
Other Features
HP MaxiLife Services includes:
•
Display the configuration details of your PC Workstation required to
obtain support (System info).
•
Indicate POST (Power-On Self Test) steps during the power-on
phase (Boot steps).
•
Perform diagnostic tests on your PC Workstation's various hardware
components and display the results (Diags).
1
Ensure that your PC Workstation's power cord is connected to a
grounded outlet. Power on the PC Workstation.
2
Press the LCD Service control button to access the following menus.
System info
Boot steps
Next
Go
System info
Exit
Next
Go
3
Use
to scroll down through the menu items and
required menu item.
Select
3 Troubleshooting Your HP PC Workstation
Using HP MaxiLife to Diagnose Problems
ERROR
ERROR DESCRIPTION
A POST error occurred. Refer to the
Troubleshooting Guide for more
information about the error description.
System info
Boot steps
Next
Go
System info
Exit
Next
Exit
to select the
55