Initialization Pulse Adjustment
Initialization Pulse Adjustment
1. Input a 100% White signal to the unit.
2. Set the picture controls as follows:
Picture menu : Vivid
Picture : +25
Aspect : Full
3. Connect an Oscilloscope to test point TPSC1. Using VR6602, adjust (T2) for 195+/-
10µ Sec.
The initialization pulse adjustment is mandatory after replacing the SC, P, and SS
board. It is required after replacing the plasma display panel. If misadjusted, several
images may be displayed on the screen at the same time. Follow the instructions
displayed on the slide to perform the adjustment.
82