Installation Instructions If you have questions, call 800.GE.CARES or visit our website at: www.monogram.com 30", 36" and 48" Professional Vent Hoods Models: ZV48T, ZV48S ZV36T, ZV36S ZV30T, ZV30S Monogram. ®...
Installation Instructions BEFORE YOU BEGIN WARNING: TO REDUCE THE RISK OF FIRE, ELECTRICAL Read these instructions completely and carefully. SHOCK OR INJURY TO PERSONS, OBSERVE THE • IMPORTANT - Save these instructions for FOLLOWING: local inspector’s use. A. Use this unit only in the manner intended by the •...
Advance Planning DETERMINE INSTALLATION HEIGHT, DUCT COVER ACCESSORIES These vent hoods must be installed 30" min. to Tapered or Straight-Sided Straight-Sided Hoods Hoods Only 36" max. above the standard 36" high cooking w/ Standard w/ Full-Width surface. The exact hood installation height is Duct Cover Duct Cover determined by the ceiling height.
Advance Planning ADVANCE PLANNING POWER SUPPLY IMPORTANT - (Please read carefully) Ductwork Planning • These vent hoods are equipped for 10" round WARNING: ductwork. For best performance, use 10" round FOR PERSONAL SAFETY, THIS APPLIANCE MUST ductwork on the 48" wide hoods. 30" and 36" hoods BE PROPERLY GROUNDED.
10" Dia. 56 ft. *Actual length of straight duct plus duct fitting equivalent. Equivalent length of duct pieces are based on actual tests conducted by GE Evaluation Engineering and reflect requirements for good venting performance with any ventilation hood. Total Duct Run...
Installation Preparation PARTS PROVIDED Locate the parts packed with the hood. Wood Support Duct Transition with Original Screws with Damper 2 Stainless Steel Grease Filters (3 filters with 48" models) Heat Lamp (2 with 48" models) 2 Grease Filter Trays Allen Wrench 2 Implement Rods and 4 Stand-offs (3 supports with 48"...
Installation Instructions STEP 1 DETERMINE HOOD, DUCTWORK AND WIRING LOCATIONS • Use a level to draw the cooktop centerline location. Draw the line to ceiling height. 9-7/8" • Measure desired distance from the bottom of the hood to the cooking surface, 30" min. to 36" max. Top of Hood Note: If you are installing the hood with duct covers, be sure to read “Using Duct Cover Accessories”...
Installation Instructions STEP 2A INSTALL HOOD ONTO WALL IMPORTANT: Framing must be capable of supporting up to 150 lbs. Install Transition Onto Top of Hood SKIP THIS STEP IF INSTALLING BENEATH A SOFFIT OR CABINET, GO TO STEP 2B. • Locate at least 2 vertical studs at the wood support. Duct •...
Engage Top “A” “B” Add Shims 1/4" Gap Keyhole Slots If Bottom Centerline to Stud Hood Width Is Recessed and Keyhole Slots At the Top ZV48T 19-9/16" 40" Push Back Back to Wall Wall ZV48S 23-9/16" 47-15/16" ZV36T 13-9/16" 28"...
Installation Instructions STEP 4 CONNECT ELECTRICAL STEP 3 CONNECT DUCTWORK • Install ductwork, making connections in direction of Verify that power is turned off at the source. airflow as illustrated. • Secure joints in ductwork with sheetmetal screws. WARNING: • Wrap all duct joints with duct tape for an airtight seal. If house wiring is not •...
Installation Instructions STEP 6 INSTALL MOTOR STEP 7 INSTALL FILTERS Outlet Attachment Spring Slot Clip • From the inside of the hood, slip motor into the • Place filter drip trays into the rear of the hood. attachment slot on the left. •...
Installation Instructions STEP 8 INSTALL IMPLEMENT RODS Screw Stand-offs Into Hood Use Allen Wrench to Secure Rod to Stand-offs • Use a flat blade screwdriver to install stand-offs into the bottom of the hood. • Align implement rod to stand-offs with the screw hole towards the inside of the hood.
Page 16
1.800.444.1845. Note: Product improvement is a continuing endeavor at General Electric. Therefore, materials, appearance and specifications are subject to change without notice. GE Consumer & Industrial Pub. No. 49-80151-4 GE Appliances Dwg. No. 164D4290P108 General Electric Company...