hit counter script
GE Monogram ZV48T Installation Instructions Manual
GE Monogram ZV48T Installation Instructions Manual

GE Monogram ZV48T Installation Instructions Manual

30", 36" and 48" professional vent hoods
Hide thumbs Also See for Monogram ZV48T:

Advertisement

Quick Links

Installation
Instructions
If you have questions, call 800-GE-CARES or visit our website at: www.monogram.com
30", 36" and 48"
Professional Vent Hoods
Models:
ZV48T, ZV48S
ZV36T, ZV36S
ZV30T, ZV30S
1
Monogram.
®
We bring good things to life.

Advertisement

Table of Contents
loading

Summary of Contents for GE Monogram ZV48T

  • Page 1: Installation Instructions

    Installation Instructions If you have questions, call 800-GE-CARES or visit our website at: www.monogram.com 30", 36" and 48" Professional Vent Hoods Models: ZV48T, ZV48S ZV36T, ZV36S ZV30T, ZV30S Monogram. ® We bring good things to life.
  • Page 2: Before You Begin

    Installation Instructions BEFORE YOU BEGIN WARNING: TO REDUCE THE RISK OF FIRE, ELECTRICAL Read these instructions completely and carefully. SHOCK OR INJURY TO PERSONS, OBSERVE THE • IMPORTANT - Save these instructions for FOLLOWING: local inspector’s use. A. Use this unit only in the manner intended by the •...
  • Page 3: Table Of Contents

    Installation Instructions CONTENTS Parts Provided ..............9 Step 1, Determine Ductwork and Wiring Locations ..10 Product Dimensions ............3 Step 2A, Install Hood Onto Wall ........11 Installation Clearances ............. 4 Step 2B, Install Hood Beneath Soffit ......12 Optional Duct Cover Accessories ........
  • Page 4: Installation Clearances

    Advance Planning INSTALLATION CLEARANCES OPTIONAL DUCT COVER These vent hoods are designed to be installed onto a ACCESSORIES wall or beneath a soffit or cabinet. Decorative duct covers are available in 6" and 12" • Install these hoods* 30" Min. to 36" Max. above the heights.
  • Page 5: Advance Planning

    Advance Planning ADVANCE PLANNING POWER SUPPLY Ductwork Planning IMPORTANT - (Please read carefully) • These vent hoods are equipped for 10" round WARNING: ductwork. In most instances they may be transitioned to 8" round. FOR PERSONAL SAFETY, THIS APPLIANCE MUST •...
  • Page 6: Duct Fittings

    24 ft. * Actual length of straight duct plus duct fitting equivalent. Equivalent length of duct pieces are based on actual Total Duct Run tests conducted by GE Evaluation Engineering and reflect requirements for good venting performance with any ventilation hood.
  • Page 7: Using Duct Cover Accessories

    Advance Planning USING DUCT COVER ACCESSORIES We recommend that the vent hood and decorative To avoid unsightly gaps, plan the hood installation height for duct cover use. Use the following formula duct cover (if used) be on site before final framing and to calculate the need for one or more duct covers wall finishing.
  • Page 8: Tools And Materials Required

    Installation Preparation TOOLS AND MATERIALS REQUIRED (NOT SUPPLIED) • 1/4" pivoting hex socket Additional Materials: Tools • Flashlight • 120V 60Hz. 15 or 20 Amp, 2 wire with ground. • Pencil and tape measure • Metal Snips Properly grounded branch circuit. •...
  • Page 9: Parts Provided

    Installation Preparation PARTS PROVIDED Locate the parts packed with the hood. Wood Support Duct Transition with Original Screws with Damper 2 Stainless Steel Grease Filters (3 filters with 48" models) Heat Lamp (2 with 48" models) 2 Grease Filter Trays Allen Wrench 2 Implement Rods and 4 Stand-offs (3 supports with 48"...
  • Page 10: Step 1, Determine Ductwork And Wiring Locations

    Installation Instructions STEP 1 DETERMINE HOOD, DUCTWORK AND WIRING LOCATIONS • Use a level to draw the cooktop centerline location. Draw the line to ceiling height. Top of Hood • Measure desired distance from the bottom of the hood to the cooking surface, 30" min. to 36" max. Wood Note: If you are installing the hood with duct covers, be sure to read 18"...
  • Page 11: Step 2A Install Hood Onto Wall

    Installation Instructions STEP 2A INSTALL HOOD ONTO WALL IMPORTANT: Framing must be capable of supporting up to 150 lbs. Install Transition Onto Top of Hood SKIP THIS STEP IF INSTALLING BENEATH A SOFFIT OR CABINET, GO TO STEP 2B. • Locate at least 2 vertical studs at the wood support. Duct •...
  • Page 12: Step 2B, Install Hood Beneath Soffit

    Installation Instructions STEP 2B Alternate Mounting Method INSTALL HOOD TO SOFFIT OR BENEATH CABINETS SKIP THIS STEP IF USING WALL MOUNTING IMPORTANT: Soffit framing must be capable METHOD of supporting up to 150 lbs. When necessary, the hood may be installed so that it is Install Transition Onto Top of Hood supported by the soffit.
  • Page 13: Step 3 Connect Ductwork

    Installation Instructions STEP 4 CONNECT ELECTRICAL STEP 3 CONNECT DUCTWORK • Install ductwork, making connections in direction of Verify that power is turned off at the source. airflow as illustrated. • Secure joints in ductwork with sheetmetal screws. WARNING: • Wrap all duct joints with duct tape for an airtight seal. If house wiring is not 2-wire •...
  • Page 14: Step 6 Install Motor

    Installation Instructions STEP 6 INSTALL MOTOR STEP 7 INSTALL FILTERS Outlet Attachment Spring Slot Clip • From the inside of the hood, slip motor into the • Place filter drip trays into the rear of the hood. attachment slot on the left. •...
  • Page 15: Step 8 Install Implement Rods

    Installation Instructions STEP 8 INSTALL IMPLEMENT RODS Screw Stand-offs Into Hood Use Allen Wrench to Secure Rod to Stand-offs • Use a flat blade screwdriver to install stand-offs into the bottom of the hood. • Align implement rod to stand-offs with the screw hole towards the inside of the hood.
  • Page 16 Note: While performing installations described in this book, safety glasses or goggles should be worn. ® For Monogram local service in your area, call 1-800-444-1845. Note: Product improvement is a continuing endeavor at General Electric. Therefore, materials, appearance and specifications are subject to change without notice. Monogram.

Table of Contents