Connection

4.1

Procedure for installing the Inverter

Prerequisites for installing the Inverter
Before you install the Inverter, check that the following preconditions are fulfilled:
● Are the ambient conditions permissible?
● Are the components required for the installation available?
● Are all the necessary tools and spare parts available?
● Have the cables and wires been routed in accordance with the applicable regulations?
● Do the minimum distances from other equipment comply with the specifications?
Installation procedure
● Using the information from the drill pattern, mark the necessary fixing points for the
● Ensure that the correct orientation of the Inverter is observed.
● Ensure that the ambient operating conditions are observed.
● Ensure that the correct fuse protection is installed.
● Install the memory card holder and memory card if required.
● Construct the necessary cables (in accordance to the information provided).
● Connect the AS-i cable to the AS-i bus.
● For commissioning, connect either the IOP Hand-held Kit or a PC utilizing the STARTER
The installation is now completed and the commissioning of the Inverter can now
commence.
SINAMICS G110D
Operating Instructions, 2009-05-15, A5E02385577A AB
Inverter onto the area on which the Inverter is to be mounted.
software and the optical cables.
4
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents