4. Wait until the copies are synchronized. Then, change the role of the copies and make the
new copy of the primary copy, as shown in Figure 6-61.
Figure 6-61 Making the new copy in a different storage pool as primary
5. A task completion window will be shown as in Figure 6-62.
Figure 6-62 Primary copy change task completed
340
Implementing the IBM Storwize V5000 Gen2 with IBM Spectrum Virtualize V8.1