RAIN MASTER
®
Flow Max Setup Procedure
The following section details the programming required in order to setup a Flow Max
configuration. Programming must be performed at all controllers that will be part of
the Flow Max system.
A typical Flow Max setup includes the following:
Submaster:
• Submaster Address Entry
• Participant Selection
• Share Devices Configuration
• Flow Meter K and Offset Values
• Station Number and Valve/Pump Assignments
• Unscheduled Flow Limits
Satellite (Non-Participant):
• Non-participant selection
Satellite (Participant):
• Participant selection
• Share devices configuration
• Flow Meter K and Offset Values (if connected to this satellite)
This procedure utilizes the configuration depicted in Figure D-1: Hardwire
Configuration with a submaster address of 1-0. The figure illustrates a system
consisting of three controllers, a Pump, one Master Valve and one 2-inch Flow Sensor.
The Pump is physically connected to the submaster. The Master Valve and Flow
Sensor are physically connected to satellite with the address 1-1. Table 1: Flow Max
Sample Worksheet lists the parameters for each controller.
Appendix D: Setting Up a FLOW MAX System
DX3 User Manual
111