hit counter script

Extension Module Avs75.390; Dimensions And Drilling Plan; Connections; Connection Terminals Of Avs75.390 - Siemens Albatros 2 RVS13 Series User Manual

Boiler controllers
Table of Contents

Advertisement

Dimensions and drilling plan

Connections

16/109
Siemens
Building Technologies

3.3 Extension module AVS75.390

Planning, mounting location and mounting method are in compliance with the basic
modules.
L
AVS75.390
108.7
The AVS75.390 extension module must be connected to terminal
using the AVS83.490/109 connecting cable. The connectors are coded.
3.3.1

Connection terminals of AVS75.390

S
T
N
L
050110A
AVS75.390/109
000020
S050110000020
1PAVS75.390/109
n
n
n
User Manual
3 Mounting and installation
L
L1
B
H
L1
120.9
51.7
98
1
1 2
Dimensions in mm
B1
110
X50 of the basic unit
= Mixing heating circuit2
CE1U2357en
2014-07-30

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents