Mounting And Commissioning - Siemens SIPROTEC 4 7SJ61 Manual

Multi-funktional protective relay with bay controller
Table of Contents

Advertisement

3

Mounting and Commissioning

This chapter is intended for experienced commissioning staff. He must be familiar with the commissioning of
protection and control systems, the management of power systems and the safety rules and regulations.
Hardware adjustments to the power system data might be necessary. The primary tests require the protected
object (line, transformer, etc.) to carry load.
3.1
Mounting and Connections
3.2
Checking Connections
3.3
Commissioning
SIPROTEC 4, 7SJ61, Manual
C53000-G1140-C210-6, Edition 05.2016