Procedure
1. Measure the AC voltage between the terminals on the surge protection device switch:
•
•
•
•
Use the voltage tester.
4.6.3
Measure the DC voltage
Preliminary requirements
Procedure
1. Measure the DC voltage between the
output terminals:
•
•
•
•
Use the voltage tester.
4.7
Remove condensation from the cabinet
If the EVSE is off for more than two hours, condensation can occur.
BCM.S1101.0-EN | 001
•
Voltage tester
R, S and T to N
R to S
R to T
S to T
Note: The surge protection device switch shows the indications
and
N .
1.
•
Voltage tester
Power module group output 1- (A) to
power module group output 1+ (B)
Power module group output 2- (C) to
power module group output 2+ (D)
EV charge cable 1 output - (E) to EV
charge cable 1 output + (F)
EV charge cable 2 output - (G) to EV
charge cable 2 output + (H)
Note:
•
Only do this procedure if a
different procedure refers to
this procedure.
E
G
F H
A
C
B
Operation
R, S, T
D