Sign In
Upload
Manuals
Brands
ABB Manuals
Battery Charger
Terra 124
ABB Terra 124 Manuals
Manuals and User Guides for ABB Terra 124. We have
4
ABB Terra 124 manuals available for free PDF download: Manual, Operation And Installation Manual, Installation Manual, User Manual
ABB Terra 124 Manual (117 pages)
All-In-One 90kW DC Fast Charger
Brand:
ABB
| Category:
Battery Charger
| Size: 4 MB
Table of Contents
Table of Contents
5
About this Document
10
Function of this Document
10
Target Group
10
Revision History
10
Language
10
Illustrations
10
Units of Measurement
10
Typographical Conventions
11
How to Use this Document
11
General Symbols and Signal Words
11
Special Symbols for Warnings and Dangers
12
Related Documents
13
Manufacturer and Contact Data
13
Abbreviations
13
Terminology
14
Orientation Agreements
15
Safety
16
Liability
16
General Safety Instructions
16
Responsibilities for the Owner
16
Required Qualifications for the Installation Engineer
17
Personal Protective Equipment
17
Safety Instructions During Installation
17
Safety Instructions During Transport
18
Safety Instructions for Earthing
18
Safety Instructions for Use
18
Signs on the EVSE
19
Discard the EVSE or Parts of the EVSE
19
Cyber Security
20
Description
21
Type Plate
21
Intended Use
21
Working Principles
23
Terra X4 Variants CC and CJ
23
Terra X4 Variant C
25
Overview
26
Overview of the System
26
Overview of the EVSE, Outside
27
Overview of the EVSE, Inside
28
Overview of the Cable Glands of the Charge Post
29
Overview of the Installed EVSE
30
Overview of the Cable Management System (Option)
30
Authorization to Charge
31
Payment Terminal
31
Options
31
EV Charge Cable, CCS 1
31
EV Charge Cable, CCS 2
32
EV Charge Cable, Chademo
32
Integrated Payment Terminal
32
Cable Management System
32
Tilt Sensors
33
Power Allocation Strategies
34
Sequential Power Allocation
34
Concurrent Power Allocation
35
Dynamic Allocation 'First in First Served
35
Dynamic Power Allocation 'Fair Share
36
External Residual-Current Device
36
Description of the Touchscreen
37
General Description of the Layout
37
General Description of the Buttons
38
Local Service Portal
38
Cloud Service Portal
39
Inspection and Transport
40
Transport the EVSE to the Site
40
Unpacking
40
Unpacking Procedure
40
Do a Check on the Transport Sensors
40
Remove the Cabinet from the Pallet
41
Transport the EVSE on the Site
41
Hoist the Cabinet
41
Move the Cabinet with a Forklift Truck
42
Installation
44
General Installation Procedure
44
Site Preparation
44
Prepare the Site
44
Control the Space and Airflow Around the Cabinet
45
Prepare the Foundation
46
Prepare the Foundation - General Procedure
46
Prepare a Casted Foundation
46
Prepare a Standard Prefabricated Foundation
46
Replace the Standard Base with an Alternative Base
47
Remove the EVSE from the Base
48
Install a Base with Side Entrance
48
Install a Base with Reduced Height
49
Mechanical Installation
49
Mechanical Installation Procedure
49
Open the Cable Inlet and Remove the Cable Gland
50
Guide the Cables through the Opening in the Cable Guide Plate
50
Install the Cabinet on the Foundation
50
Electrical Installation
51
Electrical Installation Procedure
51
Connect the PE Wire
51
Connect the Enclosure to the Earth
52
Connect the AC Input Wires
53
Connect the Ethernet Cable
53
Tilt Sensors Installation (Option)
54
General Procedure
54
Install the Bracket of the Tilt Sensors
54
Install the Tilt Sensors
55
Connect the Tilt Sensors
55
Install a Ferrule on a Wire
56
Connect a Wire that Has a Ferrule
56
Cable Management System Installation (Option)
57
Prepare the Cable Management System
57
Mount the Clamp
58
Install the Cable Management System
58
Prepare for Commissioning
58
Operation
60
Prepare before Use
60
Stop the EVSE if There Is an Emergency
60
Reset the EVSE after an Emergency
61
Charge Session
61
Charge an EV
61
Start a Charge Session
61
Stop a Charge Session
62
Energize the EVSE
62
De-Energize the EVSE - General Procedure
62
Measure the AC Voltage
63
Measure the DC Voltage
63
Remove Condensation from the Cabinet
64
Local Service Portal Operations
65
Start the Local Service Portal
65
Set the Configuration Parameters
65
Set the OCPP Parameters
65
Install New Software
66
Close the Local Service Portal
66
Maintenance and Cleaning
67
Maintenance Schedule
67
Clean the Cabinet
67
Do a Visual Check of the EVSE
68
Replace the Air Inlet Filter
68
Replace the Air Outlet Filter
69
Access to Parts
71
Open the Doors
71
Close the Doors
71
Remove the Border Covers
72
Install the Border Covers
73
Troubleshooting
74
Troubleshooting Procedure
74
Troubleshooting Table
74
Technical Data
75
EVSE Type
75
General Specifications
75
Parts Included in the Delivery
76
Transport Specifications
76
Required Tools for Installation
77
Required Parts for Installation
77
Torque Specifications
78
Operating Conditions
78
Noise Level
78
Tilt Sensor Specifications
78
General Specifications
78
Wire Specifications
79
Wiring Diagram for the Tilt Sensors
79
The Alternative Base with Reduced Height
80
Cable Management System Specifications
81
Dimensions
82
General Dimensions
82
Packaged Product
82
Mass of the EVSE (Without Packaging Material)
83
Center of Gravity
83
Floor Space Requirements
84
Casted Foundation
85
Prefabricated Foundation
86
Alternative Base with Side Entrance
87
Cable Slack
88
Height of User Operable Elements
88
Communication Interface Specifications
89
EVSE Power Rating
90
EVSE Rating During Normal Duty Operation
90
EVSE Derating During Normal Duty Operation
90
EVSE Rating in Heavy Duty Operation
90
EVSE Derating in Heavy Duty Operation
90
Harmonics on the Grid
91
Terra 184
91
Terra 124 and 104
93
Terra 94
94
AC Input Specifications
96
General AC Input Specifications
96
AC Input Wires
97
Terra 94
97
Terra 104
97
Terra 124
98
Terra 184
98
DC Output Specifications
98
General Specifications
98
Terra 94
98
Terra 104
99
Terra 124
104
Terra 184
108
Power Consumption
112
In-Rush Current
113
Maintenance Schedule for the Service Engineer
113
Cleaning Specifications
114
Spare Parts
114
Appendix
116
Declaration of Conformity
116
Advertisement
ABB Terra 124 Operation And Installation Manual (117 pages)
All-In-One 90kW DC Fast Charger
Brand:
ABB
| Category:
Battery Charger
| Size: 4.19 MB
Table of Contents
Table of Contents
5
About this Document
10
Function of this Document
10
Target Group
10
Revision History
10
Language
10
Illustrations
10
Units of Measurement
10
Typographical Conventions
11
How to Use this Document
11
General Symbols and Signal Words
11
Special Symbols for Warnings and Dangers
12
Related Documents
13
Manufacturer and Contact Data
13
Abbreviations
13
Terminology
14
Orientation Agreements
15
Safety
16
Liability
16
General Safety Instructions
16
Responsibilities for the Owner
16
Required Qualifications for the Installation Engineer
17
Personal Protective Equipment
17
Safety Instructions During Installation
17
Safety Instructions During Transport
18
Safety Instructions for Earthing
18
Safety Instructions for Use
18
Signs on the EVSE
19
Discard the EVSE or Parts of the EVSE
19
Cyber Security
20
Description
21
Type Plate
21
Intended Use
21
Working Principles
23
Terra X4 Variants CC and CJ
23
Terra X4 Variant C
25
Overview
26
Overview of the System
26
Overview of the EVSE, Outside
27
Overview of the EVSE, Inside
28
Overview of the Cable Glands of the Charge Post
29
Overview of the Installed EVSE
30
Overview of the Cable Management System (Option)
30
Authorization to Charge
31
Payment Terminal
31
Options
31
EV Charge Cable, CCS 1
31
EV Charge Cable, CCS 2
32
EV Charge Cable, Chademo
32
Integrated Payment Terminal
32
Cable Management System
32
Tilt Sensors
33
Power Allocation Strategies
34
Sequential Power Allocation
34
Concurrent Power Allocation
35
Dynamic Allocation 'First in First Served
35
Dynamic Power Allocation 'Fair Share
36
External Residual-Current Device
36
Description of the Touchscreen
37
General Description of the Layout
37
General Description of the Buttons
38
Local Service Portal
38
Cloud Service Portal
39
Inspection and Transport
40
Transport the EVSE to the Site
40
Unpacking
40
Unpacking Procedure
40
Do a Check on the Transport Sensors
40
Remove the Cabinet from the Pallet
41
Transport the EVSE on the Site
41
Hoist the Cabinet
41
Move the Cabinet with a Forklift Truck
42
Installation
44
General Installation Procedure
44
Site Preparation
44
Prepare the Site
44
Control the Space and Airflow Around the Cabinet
45
Prepare the Foundation
46
Prepare the Foundation - General Procedure
46
Prepare a Casted Foundation
46
Prepare a Standard Prefabricated Foundation
46
Replace the Standard Base with an Alternative Base
47
Remove the EVSE from the Base
48
Install a Base with Side Entrance
48
Install a Base with Reduced Height
49
Mechanical Installation
49
Mechanical Installation Procedure
49
Open the Cable Inlet and Remove the Cable Gland
50
Guide the Cables through the Opening in the Cable Guide Plate
50
Install the Cabinet on the Foundation
50
Electrical Installation
51
Electrical Installation Procedure
51
Connect the PE Wire
51
Connect the Enclosure to the Earth
52
Connect the AC Input Wires
53
Connect the Ethernet Cable
53
Tilt Sensors Installation (Option)
54
General Procedure
54
Install the Bracket of the Tilt Sensors
54
Install the Tilt Sensors
55
Connect the Tilt Sensors
55
Install a Ferrule on a Wire
56
Connect a Wire that Has a Ferrule
56
Cable Management System Installation (Option)
57
Prepare the Cable Management System
57
Mount the Clamp
58
Install the Cable Management System
58
Prepare for Commissioning
58
Operation
60
Prepare before Use
60
Stop the EVSE if There Is an Emergency
60
Reset the EVSE after an Emergency
61
Charge Session
61
Charge an EV
61
Start a Charge Session
61
Stop a Charge Session
62
Energize the EVSE
62
De-Energize the EVSE - General Procedure
62
Measure the AC Voltage
63
Measure the DC Voltage
63
Remove Condensation from the Cabinet
64
Local Service Portal Operations
65
Start the Local Service Portal
65
Set the Configuration Parameters
65
Set the OCPP Parameters
65
Install New Software
66
Close the Local Service Portal
66
Maintenance and Cleaning
67
Maintenance Schedule
67
Clean the Cabinet
67
Do a Visual Check of the EVSE
68
Replace the Air Inlet Filter
68
Replace the Air Outlet Filter
69
Access to Parts
71
Open the Doors
71
Close the Doors
71
Remove the Border Covers
72
Install the Border Covers
73
Troubleshooting
74
Troubleshooting Procedure
74
Troubleshooting Table
74
Technical Data
75
EVSE Type
75
General Specifications
75
Parts Included in the Delivery
76
Transport Specifications
76
Required Tools for Installation
77
Required Parts for Installation
77
Torque Specifications
78
Operating Conditions
78
Noise Level
78
Tilt Sensor Specifications
78
General Specifications
78
Wire Specifications
79
Wiring Diagram for the Tilt Sensors
79
The Alternative Base with Reduced Height
80
Cable Management System Specifications
81
Dimensions
82
General Dimensions
82
Packaged Product
82
Mass of the EVSE (Without Packaging Material)
83
Center of Gravity
83
Floor Space Requirements
84
Casted Foundation
85
Prefabricated Foundation
86
Alternative Base with Side Entrance
87
Cable Slack
88
Height of User Operable Elements
88
Communication Interface Specifications
89
EVSE Power Rating
90
EVSE Rating During Normal Duty Operation
90
EVSE Derating During Normal Duty Operation
90
EVSE Rating in Heavy Duty Operation
90
EVSE Derating in Heavy Duty Operation
90
Harmonics on the Grid
91
Terra 184
91
Terra 124 and 104
93
Terra 94
94
AC Input Specifications
96
General AC Input Specifications
96
AC Input Wires
97
Terra 94
97
Terra 104
97
Terra 124
98
Terra 184
98
DC Output Specifications
98
General Specifications
98
Terra 94
98
Terra 104
99
Terra 124
104
Terra 184
108
Power Consumption
112
In-Rush Current
113
Maintenance Schedule for the Service Engineer
113
Cleaning Specifications
114
Spare Parts
114
Appendix
116
Declaration of Conformity
116
ABB Terra 124 Installation Manual (54 pages)
Brand:
ABB
| Category:
Industrial Equipment
| Size: 2 MB
Table of Contents
Table of Contents
3
About this Document
6
Function of this Document
6
Target Group
6
Revision History
6
Language
6
Illustrations
6
Units of Measurement
6
Typographical Conventions
6
How to Use this Document
6
General Symbols and Signal Words
7
Special Symbols for Warnings and Dangers
8
Related Documents
8
Manufacturer and Contact Data
8
Abbreviations
9
Terminology
9
Orientation Agreements
10
Description
11
Type Plate
11
Intended Use
11
Working Principles
12
Terra 94, 124 and 184 CC and CJ
12
Terra 94, 124 and 184 C
13
Overview
14
Overview of the System
14
Overview of the EVSE, Outside
15
Overview of the EVSE, Inside
16
Options
17
EV Charge Cable, Combo 2
17
EV Charge Cable, Chademo
17
Integrated Payment Terminal - CCV
17
External Residual-Current Device
18
Safety
19
Liability
19
General Safety Instructions
19
Required Qualifications for the Installation Engineer
19
Personal Protective Equipment
20
Safety Instructions During Installation
20
Safety Instructions During Transport
21
Safety Instructions for Earthing
21
Signs on the EVSE
21
Discard Parts or the EVSE
22
Transport
23
Transport the EVSE to the Site
23
Transport the EVSE on the Site
23
Hoist the Cabinet
23
Move the Cabinet with a Forklift Truck
24
Installation
25
General Installation Procedure
25
Site Preparation
25
Prepare the Site
25
Control the Space and Airflow Around the Cabinet
26
Prepare the Foundation
26
Prepare the Foundation - General Procedure
26
Prepare a Standard Prefab Foundation
26
Prepare a Custom Foundation
27
Unpacking
27
Unpacking Procedure
27
Do a Check on the Transport Sensors
27
Remove the Cabinet from the Pallet
28
Mechanical Installation
28
Mechanical Installation Procedure
28
Open the Cable Inlet and Remove the Cable Gland
28
Guide the Cables through the Opening in the Cable Guide Plate
29
Install the Cabinet on the Foundation
29
Electrical Installation
30
Electrical Installation Procedure
30
Connect the Wires of the AC Input Cable
30
Connect the PE Wire
31
Connect the Enclosure to the Earth
32
Connect the Ethernet Cable
32
Prepare for Commissioning
33
Access to Parts
34
Open the Doors
34
Close the Doors
34
Remove the Border Covers
35
Install the Border Covers
35
Troubleshooting
37
Troubleshooting Procedure
37
Technical Data
38
EVSE Type
38
Parts Included in the Delivery
38
General Specifications
39
Required Tools for Installation
39
Torque Specifications
40
Ambient Conditions
40
Mass and Center of Gravity
40
Noise Level
40
Transport Specifications
41
Dimensions
41
General Dimensions
41
Cable Slack
41
Floor Space Requirements
42
Prefab Foundation
43
Custom Foundation
44
Logic Interface Specifications
44
AC Input Specifications
45
General AC Input Specifications
45
AC Input Cable
45
Terra 94
45
Terra 124
46
Terra 184
46
DC Output Specifications
46
General Specifications
46
Terra 94
46
Terra 124
48
Terra 184
50
Power Consumption
51
General Specifications
51
Terra 94
51
Terra 124
51
Terra 184
52
Current Peaks During the Start of a Charge Cycle
52
Advertisement
ABB Terra 124 User Manual (44 pages)
Brand:
ABB
| Category:
Battery Charger
| Size: 1.64 MB
Table of Contents
Table of Contents
3
About this Document
6
Function of this Document
6
Target Group
6
Revision History
6
Language
6
Illustrations
6
Units of Measurement
6
Typographical Conventions
6
How to Use this Document
7
General Symbols and Signal Words
7
Special Symbols for Warnings and Dangers
8
Related Documents
8
Manufacturer and Contact Data
9
Abbreviations
9
Terminology
9
Orientation Agreements
10
Description
11
Type Plate
11
Intended Use
11
Overview
12
Overview of the System
12
Overview of the EVSE, Outside
13
Overview of the EVSE, Inside
14
Authorization to Charge
14
Payment Terminal
15
Description of the Touchscreen
15
General Description of the Layout
15
General Description of the Buttons
16
Options
16
EV Charge Cable, Combo 2
16
EV Charge Cable, Chademo
17
Integrated Payment Terminal - CCV
17
Integrated Payment Terminal - Nayax
17
Safety
18
Liability
18
General Safety Instructions
18
Responsibilities for the Owner
18
Personal Protective Equipment
19
Safety Instructions for Use
19
Safety Instructions During Cleaning or Maintenance
20
Safety Instructions for Earthing
20
Signs on the EVSE
20
Discard Parts or the EVSE
21
Operation
22
Prepare before Use
22
Stop the EVSE if There Is an Emergency
22
Reset the EVSE after an Emergency
22
Charge Session
23
Charge an EV
23
Start a Charge Session
23
Stop a Charge Session
23
Energize the EVSE
24
De-Energize the EVSE - General Procedure
24
Measure the AC Voltage
24
Measure the DC Voltage
25
Remove Condensation from the Cabinet
25
Maintenance and Cleaning
26
Maintenance Schedule
26
Clean the Cabinet
26
Do a Check on the Cabinet
27
Replace the Air Inlet Filter
27
Replace the Air Outlet Filter
28
Troubleshooting
30
Troubleshooting Procedure
30
Troubleshooting Table
30
Access to Parts
31
Open the Doors
31
Close the Doors
31
Technical Data
33
EVSE Type
33
General Specifications
33
Maintenance Schedule for the Service Engineer
34
Spare Parts
34
Cleaning Specifications
35
Floor Space Requirements
35
Ambient Conditions
36
Noise Level
36
Logic Interface Specifications
36
DC Output Specifications
37
General Specifications
37
Terra 94
37
Terra 124
39
Terra 184
40
Power Consumption
42
General Specifications
42
Terra 94
42
Terra 124
42
Terra 184
42
Advertisement
Related Products
ABB Terra 104 North America
ABB Terra 124 North America
ABB Terra 184 North America
ABB Terra 184
ABB Terra 180 CE
ABB Terra 104
ABB Terra 124 UL
ABB Terra 184 UL
ABB Terra 124 Gen 2
ABB Terra 184 Gen 2
ABB Categories
Industrial Equipment
Controller
Measuring Instruments
Battery Charger
DC Drives
More ABB Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL