2−6
Step-by-Step Basic Installation
This section will guide you through the following basic steps of installation:
Step
1
Choose a mounting location in compliance with the Warnings and Cautions.
See NOTE below.
2
Check the mounting location for adequate ventilation
3
Cover the inverter's ventilation openings to prevent debris from entering.
4
Check the inverter dimensions for footprint and mounting hole locations.
5
Study the Cautions, Warnings, wire and fuse sizes, and terminal torque
specifications before wiring the inverter.
6
Connect wiring for the inverter power input.
7
Wire the inverter output to the motor.
8
Uncover the inverter's ventilation openings applied in Step 3.
9
Perform the Powerup Test. (This step includes several sub steps.)
10
Make observations and check your installation.
NOTE: If the installation is in an EU country, study the EMC installation guidelines in
Appendix D.
Activity
Page