INSTALLATION INFORMATION
A licensed accredited installer should install all wood heaters. Please ask
retailer to locate an installer.
All warranty is void unless installed by an authorised installer.

INSTALLATION CHECKLIST

(Refer to next page for more detailed instructions)
Minimum clearances to combustible materials:-
Supplied steel cross bearer to rear wall
Side wall within enclosure to side of heater
Front of heater to existing wall in house
Underside clearance to base of heater
Ceiling clearance to top of heater
Flue Requirements:-
Standard 150mm diameter double cased flue kit (AS 2918)
300mm diameter outer casing extending from appliance to a minimum
300mm above ceiling penetration.
Clearance between outer casing and ceiling minimum of 25mm, eg.
350mm hole in ceiling
Floor Requirements if floor is heat sensitive:-
If base of heater is a 590mm or more from the floor, then floor protector
must be minimum of 6mm fibro cement sheet extending under heater and
300mm in front of door opening and 200mm either side
If base of heater is less than 590mm from floor, then floor protector must
comply with AS/NZ 2918:2001, clause 3.3.3.
Other Requirements:-
Front wall of enclosure must be comprised of non combustible material
Enclosure around heater must include vents top and bottom
Set up for fan to be connected to mains power supply, eg. Install power
socket in enclosure, or access for extension cord to fan.

PARTS SUPPLIED

Nectre 800 Wall Heater (includes facia trim and fan)
100mm x 1130mm long C-section cross bearers (Qty = 2)
100mm x 500mm long C-section support channels (Qty = 2)
Steel framing for front wall and heater surround (No. pieces = 4)
Nuts, bolts, and washers for fastening channels and heater (8 of each)
25mm
200mm
500mm
200mm
1170mm
4