4 Project planning for control and indicating panels
The following table should help you to determine the maximum current:
Device / Module /
Element
MPC
FDC
GMG
PMG
Load factor element

Table 8: Determining maximum current

A fully expanded FDnet loop with 280 load factors has a current draw of
around 70 mA.
4.4.3

Dual SOC

A second SOC module (central computer) takes over the task of the first SOC module com-
pletely in the event of a failure.
When installing systems under VdS guidelines with:
central ÜE activation in SIGMANET
SIGMASYS M control and indicating panels in SIGMANET
control and indicating panels that control several extinguishing sectors
If several SIGMASYS C control and indicating panels are networked by SIGMANET and if central
ÜE actuation is required, the ÜE must be connected to a SIGMASYS M control and indicating
panel with Dual SOC.
Warning:
With Dual SOC operation, both modules must have at least S24230-A100-A3
release status.
Both modules must have the same firmware status.
4.4.4

SOC P module (since end 2006)

Since March 2007 the SIGMASYS M control and indicating panels and M cores have
been supplied without the SOC module.
The previous SOC module or the SOC P module can be installed as an option. (P stands for
performance)
The SOC P module has a much faster computer, more memory and faster interfaces than the
SOC module.
Control and indicating panels with the "SIGMANET P" SOC P module are networked using
the FN2001-D1 networking module, which must be ordered separately. In the case of Dual
SOC P operation, both SOC P modules must each be equipped with an FN2001-D1 network-
ing module.
The interfaces of the SOC P module are made available on the APL20 P, which must be or-
dered separately.
With Dual SOC P operation an additional crossover Ethernet cable, order number
A5Q00019146, is required. Only one APL20 P is needed for both SOC P modules.
20 / 128
Current draw
Comment
Module
150 mA
+ load factor of all connected elements
70 mA
+ load factor of all connected elements
80 mA
+ load factor of all connected elements
35 mA
+ load factor of all connected elements
0.25 mA
SIGMALOOP-PMG-GMG Sinteso elements
BMT Project Planning Guidelines
Best.Nr. A24205-A337-B970 – Edition 12 (03/07)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sigmasys m

Table of Contents

Save PDF