2.3.2 Charging voltage confirmation
With respect to the
1 Press Adjustment/operational checkout at the second page of the
Password protection,
refer to 2.1 setting of
service personnel
maintenance mode.
2 Press Charge voltage confirmation.
With respect to positions of
the board and the test pin,
refer to "3.3.2 EZJ94 board /
EZJ106 board".
After the completion of
the adjustment, the work
can be stopped before the
passing of 3 minutes by
pressing the Abort key.
●This confirmation is performed in a state the IJ printer "stop" state.
● Attach the nozzle head cover for check.
●Before this confirmation, set "the speed follow-up" on the "user environment
setup" screen to "0: none".
● Be sure to perform this confirmation when performing the board exchange
(EZJ93 and EZJ94/EZJ106).
service maintenance screen.
When the Next menu are not displayed in the maintenance work menu, set to
the service personnel maintenance mode by the password protection.
Adjust./oper. checkout
Excitation
adjustment
Auto-phase gain
adjustment
Since the voltage for the confirmation is output for 3 minutes, measure the TP12
on the EZJ 94 board / EZJ106 board using an oscilloscope and confirm that the
TP12 is in the range of DC 250 ± 15V.
Charge voltage confirmation
Proc. status: In progress
Execution takes 3 minutes.
【Waveform of charge voltage confirmation】
Charge voltage
If the charge voltage cannot be checked using this function because the IJ printer
is operating, use the following values for reference:
Charge voltage for Auto-phase : Approx. 11 V
Charge voltage for printing (least significant dot):
Charge voltage for printing (most significant dot):
However, the charge voltage for printing will vary depending on the particle use
ratio and printing conditions (character height setting and character width).
Status:XXXXX
Charge voltage
Phase margin test
confirmation
Level sensor
Heating unit
confirmation
confirmation
Status:XXXXX
Approx. 70 V (character height: 99; particle use ratio: 03)
Approx. 280 V (character height: 99; particle use ratio: 03)
2-7
Shut
Manual
down
Back
Abort
GND Level