Installing the generator and the stand
Installing the cable ducts
1. Position the cable ducts (1) to the stand and the generator respectively.
2. Leave sufficient space, approx 10 mm between the cable ducts (1) and the base
3. Check that the cable duct (1) is slightly overlapped by the cable outlet cover (4).
Fig. 3 Installing the cable ducts (top view)
1. Mark the outlines of the cable ducts (1) on the floor.
2. Cut the bottom of the cable ducts (6) and the cable duct cover (5) to proper length.
NOTICE
3. Fasten the bottom plate of the cable ducts (6) to the floor according to marking,
4. At the generator, cover the cable entry not used with the enclosed cover plate (7).
Installations with separate control console
For the connection cable separate control console – generator, additional cable ducts are
required, unless the cables are to be laid underfloor.
Siemens AG
Medical Solutions
plate of the stand (3) to allow for the mounting of the cable outlet cover (4).
4
3
Fig. 3 shows a right-angled installation of the cable ducts.
If the generator is to be installed at an other angle to the stand,
you just have to cut the cable ducts correspondingly.
using double-sided adhesive tape.
Register 3
1
10 mm
SPB7-230.033.11
Rev. 06
05.06
1
7
Page 3 of 6
CS PS SP
Installation and Start-Up
4 - 3
4
5
6
9
8
0
0
0
M
A
M
4
M1000/3000 Nova